Start Here
Start here
4 steps to a usable answer.
Questions first. Workbook next. Room photo only if you need it. Then read the result.
01
Answer 6 questions
Set the file and answer the six questions.
02 Run a spreadsheetUse the sample spreadsheet or upload your own Excel file.
03 Open the mapRead the worksheet owner, the join key, and the connected sheets.
04 Add 1 room photoOnly do this when the review needs visual proof.
05 Read the scoreOpen the dashboard and see the issues and next step.
Day Zero Pilot
Cross-SOR contradiction sweep for one site and one workbook lane.
Scope exported records, run the top constraint checks, and return a review packet with sourced findings. Pilot terms are handled by inquiry after source boundaries are clear.
// SCOPE
- MES x Calibration: equipment validity at execution
- LIMS x Calibration: instrument validity at test
- QMS x MES: open deviation vs batch progression
- MES x LMS: operator qualification at execution
- MES x EMS: sterility claim vs environmental state
- 10 Day Zero constraints and relational topology map
- Findings expressed as defensibility questions, not control-system actions
// REQUEST
Submit one site, one release or execution call, and the export types available from each system involved.